The HPOA Board of Directors is proposing replacement of our existing 84-slip cedar float marina that is nearing the end of it's servicable lfe. The Board has been working with Harrison Dock Builders (HDB) and developed a proposed design for an replaced with an 84-slip, steel frame, poly float supported marina with permanent slip covers. Board president, Hal Thompson has also been in communication with the Coeur d'Alene Tribe Lake Management Department regarding the replacement project.
Over the past few months, the Board has sent a series of e-mails to HPOA member property owners describing the project in preperation for asking the membership for approval to proceed with the project with an estimated cost of $19,000 per slip.
Below are links to the proposed marina design, the design superimposed over an image of our current marina, photos of a similar marina also located on Coeur d'Alene Lake, and a draft version of a Frequently-Asked-Question document. (The FAQ is a "draft" due to it's being updated when new questions are generated and answers added.)
FREQUENTLY ASKED QUESTIONS
This is a very long document, detailed document with the goal of providing members with a full understanding of the extensive project.
Thanks for your patience as you read through the information.